  • Who monitors the design-to-budget process in a DB project?
  • What are the 2 different types of incentives used in contracts?
  • Owner Design Reviews make _____ decisions - ensure open issues get closed out efficiently.
  • Executive Agreements are known as the _____ __ _____ documents.
  • Which option is a builder failure (price-based partner selection)?
  • Which phase is primarily concerned with evaluating performance after operations have begun?
  • The project team, at the outset of the project, should establish processes to facilitate timely and effective which of the following?
  • In IDWP, one should determine how much _____ will be allocated to each _____ task.
  • Which two-word term defines the agreement about design-related expectations between parties?
  • Changes directed after _____ _____ may result in a Request for Equitable Adjustment.
  • Which statement best reflects the relationship between Validation and design Charrettes?
  • The Owner and the Design-Builder should acknowledge the significant level of effort required to manage which two aspects of the design?
  • Which process is encouraged to occur frequently to prevent issues in DB projects?
  • Owners must sustain an atmosphere of _____ and _____.
  • _____ and _____ should collaboratively and jointly define the design value that best meet Owner's goals for each project.
  • What are the 4 Steps To Execution?
  • Who leads the overall design effort or design and engineering for a discipline?
  • Which term is used to describe compensation adjustments required due to scope changes after design commitments?
  • The time from Notice of Award to the end of the warranty period is called what?
  • Which term involves managing people through the entire process?
  • Which process should be established to facilitate issue resolution at the outset?
  • Owners are responsible for an _____ and ______ environment.
  • Which process should be established to facilitate effective collaboration at the outset?
  • Which of the following is a builder failure?
  • Which role leads the design effort for an entire project or for a discipline's engineering and technical work?
  • Which role is primarily responsible for overall project execution leadership and team dynamics?
  • Which term describes the structured plan used to guide design activities in this process?
  • In DB, the cost and design parameters of the project, and therefore its value, are determined _____ the design process.
  • In IDWP, what should be included for periodic design reviews per contract?
  • _____ verifies that the design complies with performance requirements in the RFP.
  • DB can optimize _____ achievements by encouraging innovation.
  • Which failure is associated with the builder?
  • _____ establishes cost first.
  • Which statement best describes Trend Management?
  • Fill in the blanks: First build the _____ ... then build the _____.
  • The RFP stands for:
  • Owner design reviews are design charrettes. True or False?
  • Which completes the list of four key factors enabling Team Alignment: Early Involvement, Qualifications-Based Selection, Cost Transparency, and ?
  • Which estimating approach relies on complete designs with little to no flexibility?
  • _____ establishes design first.
  • The _____ Documents Prescribes how to achieve the end result.
  • _____ _____: Controls quality of production, be it design or construction.
  • The initial preliminary IDWP should have been included in the _____ stage -- refine and update.
  • Post Award is the time from the Notice of Award to the end of which period?
  • Who facilitates constructability reviews in a design-build effort?
  • One best practice is to include _____ incentives in DB contracts.
  • Closeout meetings should occur before the project reaches ___% completion.
  • Which of the following is a trade contractor failure?
  • Executive leadership requires _____ _____.
  • A Best Practice is the belief that there is a ______ , ______ or ______ that is more effective at delivering a particular outcome than any other.
  • Integrated pull planning should be performed for which two project phases?
  • An advantage of Trend Management is that it provides cross-checks.
  • Which milestone is typically achieved just before project closeout?
  • Change orders are bilateral agreements.
  • Clearly understand, define, and agree on the _____ role.
  • How can DB be expedited?
  • The RFP clearly identifies the value desired by the Owner.
  • _____ ______ is the completion of the contract and related validation for Owner's acceptance of the work.
  • Communication leads to __________ -- promotes common knowledge.
  • Which failure is a designer-specific issue regarding scope control?
  • It is difficult to measure, monitor, or manage something that is _____ .
  • The project team should establish which two elements to support integrated project delivery?
  • _____ Management mitigates disputes before they become bigger problems.
  • _____ fosters cohesion -- one team acts as one team.
  • Design value is a(n) '_____ deliverable'.
  • Change orders are _____ requested and _____ directed.
  • The Owner focuses on differentiating team qualifications and proposals to make a _____ Selection.
  • Which role is designated as the Designer of Record?
  • In typical DB project leadership, which role is primarily responsible for integrating design and construction?
  • Which role is primarily responsible for coordinating the partnership between design professionals and cost estimators?
  • All parties must be very clear about what constitutes '_____ _____'.
  • _____ is the essence of Design-Build Done Right.
  • In determining incentives, use _____ as a guide.
  • What is a key objective of Balanced MEP packages in the design phase?
  • _____ changes are considered outside the scope.
  • Changes directed after 'Design Commitment' may result in ______ for _____ _____.
  • In the Best Value calculation, which elements form the numerator?
  • Which term has a unique definition for each project in the DBIA practice?
  • What is the primary purpose of trend between milestones in DBIA practice?
  • _____ _____ has a unique definition for each project.
  • The most successful projects engage core team members in the _____ process, before advancing beyond _____ design.
  • Which artifacts are commonly developed through formal partnering?
  • Which of the following is a cost incentive?
  • Price and performance are ______ in this context.
  • Which term describes ensuring shared understanding among the team about how to execute these processes?
  • Who should create an organization that supports the successful procurement and execution of a DB project with key personnel educated and trained in DB project delivery in an integrated and collaborative environment?
  • What term describes the amount of money added to the estimate to cover unknown risks?
  • Complete the idiom: Go slow in _____ to go fast in _____.
  • Proximity leads to _____ -- the power of overhearing.
  • What characteristic should DB teams prioritize to enable effective collaboration?
  • Any changes to the Owner's project criteria, even if no cost or time is impacted, must be _____.
  • Which type of incentive do ALL contracts have?
  • What term describes the belief that there is a technique, method, or process that is more effective at delivering a particular outcome than any other?
  • Shared Savings and Award Fees are examples of which type of incentives?
  • What are the 4 DB Team Integration roles?
  • Which type of incentives offer the Owner opportunities to align the DB team's interests with their own interests?
  • Immediately after selection, re-focus the team on Project _____.
  • Which term represents the core collaborative approach in DB projects?
  • The Designer of Record is on the _____ team, and the contract deliverable is 'design-build' rather than 100% CDs.
  • _____ _____ _______ create a shared vision of project success.
  • Which concept is most directly associated with ensuring that performance requirements are met through testing and validation?
  • Which statement reflects a builder failure tied to schedule or coordination?
  • Validation is NOT a design Charrette. True or False?
  • _____ estimating occurs at intervals between formal milestone estimates.
  • _____ balances work and recognition.
  • Which role sustains a collaborative environment among people with diverse roles, backgrounds, and opinions in a DB project?
  • Which stakeholder group is commonly associated with valuing energy efficiency?
  • Which document communicates the value desired by the Owner?
  • DB project delivery allows for innovative best value solutions through _____ of the entire team.
  • Who is primarily responsible for ensuring there are no gaps between the Owner's RFP and the final accepted proposal?
  • Performance Evaluation, Audit, and Warranty Period involves _____ and _____ of project goals.
  • Which is the second stage of the five main stages of DB Leadership?
  • Value = What you ____ for what you _____.
  • Which practice best achieves the DB project delivery objective of integrating the team to deliver best value?
  • Which statement reflects a trade contractor failure?
  • In the Best Value formula (Performance + Quality) / Cost, which element is in the denominator?
  • Which choice is NOT a trade contractor failure?
  • _____ fosters cohesion -- one team acts as one team.
  • The most successful projects engage core team members in the design process, before advancing beyond which design stage?
  • In the DB process, which practice is implemented at key points to maximize value?
  • Which of the following is NOT one of the four key factors enabling Team Alignment?
  • In Best Value selection, what is the primary basis for differentiating proposals?
  • In Notice-To-Proceed, balance the schedule between the Design team, Construction team, and the Owner.
  • Which statement about contingency decreases as design detail increases is true?
  • What are the 3 synergistic elements for Owner's strategy for DB done right?
  • Who facilitates 'Marriage' between design professionals and cost estimators?
  • Which function is primarily concerned with preventing defects and ensuring the project will meet quality requirements?
  • Find the _____ between the Owner's RFP and the Design-Builder's proposal.
  • _____ estimating has no flexibility and uses 100% complete designs.
  • Which item is NOT listed as a designer failure?
  • What are the four primary phases of oversight?
  • Cost Plus Fee, Lump Sum, and Target Price are all examples of which type of incentives?
  • Energy efficiency is commonly high valued by _____.
  • Which two entities should collaboratively define the design value to meet Owner's goals?
  • Who leads most design-build projects?
  • Which option is NOT part of the 4 Steps To Execution?
  • Preliminary Architectural MEP Packages: Balance _____ - meetings during design phase are co-located.
  • Commitment to Project goals promotes team _____ and _____.
  • Which delivery method establishes design before procurement and construction?
  • Which term describes the approach that integrates the entire project team to deliver best value?
  • Value Engineering is inherent to design development process.
  • Which statement reflects a designer failure related to process leadership?
  • Joint execution planning drives early _____-_____.
  • What are the three commitments owners have gained?
  • Owners and Design-Builders should collaboratively and jointly define the _____ _____ that best meet Owner's goals for each project.
  • What term refers to the completion of the contract and validation for Owner's acceptance?
  • _____ must manage the entire DB process?
  • Which role is described as a trained creative problem solver on the DB team?
  • What are the three areas that the implementing techniques are categorized into?
  • Which item is a trade contractor failure?
  • Which document communicates the Owner's required outcomes and value?
  • Which phase commitments sets the stage for Integrated Project Leadership and Design-Build Process Control?
  • The Design-Builder provides _____ _____ as the 'eyes and ears' of the Owner.
  • What does CBA stand for?
  • ______ is what you get for what you give.
  • _____ are responsible for an integrated and collaborative environment.
  • _____ is validating operation of project systems and achievement of performance requirements.
  • Estimating needs flexibility and can have less than 100% designs. Which type of estimating is described?
  • _____ Failure: - Failure to transition from hard bid mentality. - Failure to make timely decisions. - Unrealistic expectations (Quality, Money, Time). - Scope creep. - Failure to COMMUNICATE.
  • What are the two general types of incentives?
  • In the Pre-Con phase of Oversight, one should confirm what constitutes _____ _____?
  • All DB members should be _____ and _____ in the DB process and be knowledgeable of the differences between DB and other delivery systems.
  • Who manages design information flow & deliverables?
  • How many best practices are there?
  • Which of the following is NOT one of the five main stages of DB Leadership?
  • In a performance-based environment, who primarily controls the details of how the work is performed?
  • Which outcome is influenced by the warranty period in DB projects?
  • In early project planning, joint execution planning accelerates which outcome?
  • Which failure is attributed to the designer?
  • Quality _____ is usually done by another design professional.
  • It's all about the _____: Communicate, Collaborate, Integrate.
  • Which term describes the outcome you receive for what you contribute in DB projects?
  • _____ ______ is the tool used to identify, evaluate, manage and resolve changes during design, procurement and construction.
  • Which of the following actions helps ensure changes to owner criteria are captured and communicated?
  • Guarantee of performance through warranty period improves _____.
  • IDWP stands for?
  • The _____ ensures there are no gaps between RFP and final accepted proposal.
  • Who is responsible for establishing and communicating QA & QC objectives?
  • Which is the third stage of the five main stages of DB Leadership?
  • Which term best describes the soft aspects of design quality that are difficult to measure?
  • Contract incentives are designed to do what?
  • Which role advocates for design excellence within the DB team?
  • Owners must consistently operate from an _____ DB mindset.
  • The Construction process is _____ while the design process is ______.
  • Quality _____ can be more problematic and many times never really addressed.
  • Which process should be established to facilitate timely and effective communication at the outset?
  • Formal partnering typically results in mutually developing a _____ , _____ Matrix, and an _____ _____ Ladder
  • Estimating starts conceptually and progresses to detailed estimating as the project proceeds. Which pair correctly completes the blanks?
  • In which phase of oversight is it key to be accessible and flexible?
  • Which statement about risk in incentives is correct?
  • In DB, requirements are _____ based.
  • Which item is included as a step in the 4 Steps To Execution?
  • In IDWP, you should identify the level of _____ required for documentation of each element.
  • ______ _____ is when the owner may use or occupy the project or designated portion thereof for the intended purpose.
  • Final Architectural MEP Package: Balance _____ of _____ with activity on site.
  • Formal partnering (or disputes review board) occurs in which phase of oversight?
  • Closeout planning starts at what point in the project?
  • Senior leadership must support DB project _____.
  • Owner Design Reviews make _____ decisions if provided options.
  • Which role is licensed to protect the health, safety and welfare of the public?
  • Complete the phrase: 'Create and _____ a culture for success'.
  • Quality _____ is usually done by another design professional.
  • Which role is the Estimator associated with in the DB Team Integration?
  • Owners traditionally 'trust' _____ , and typically are skeptical of _____.
  • Design Quality ______ is the hard stuff but easy to measure.
  • In a design-build project, which role is primarily responsible for sustaining a collaborative environment among diverse stakeholders?
  • Encourage frequent 'over-the-shoulder' _____ _____ process (not the typical DBB 30%; 60%; 90% and 100% CD's linear process.)
  • Which statement describes a builder-related failure in communication?
  • As design detail increases, which of the following tends to decrease?
  • Which term best describes the formal process of adjusting compensation due to scope changes?
  • Advantages can be lost if administration of the processes/contracts employ more of a ____ _____ mindset.
  • Who are considered to be 'trained creative problem solvers'?
  • Who has to perform their design services within a common 'Standard of Care'?
  • Who manages design performance interface?
  • Which stage is primarily associated with project completion activities and formal handover?
  • Under design-build, the contract deliverable is typically which?
  • Which pair completes the phrase: design _____ trending versus _____?
  • Which delivery method is associated with pricing and cost early?
  • Which group is responsible for sustaining trust and flexibility in the project environment?
  • Executive leadership requires True Believers.
  • Which of the following is one of the two main roles in public owner contract oversight?
  • Which phrase best describes the environment created by Owners for DB projects?
  • Which milestone marks the initiation of commissioning activities and the verification of systems performance?
  • _____ _____ is the part of quality management focused on providing confidence that project quality requirements defined in the RFP will be fulfilled.
  • Which statement about incentives in DB contracts is true?
  • ______ _____ is commitment between 2 or more organizations for the purpose of achieving specific business objectives by maximizing the effectiveness of each participant's resources.
  • Which option best represents a designer failure related to communication?
  • Contingencies and allowances are known as what?
  • Who defines value?
  • The _____ establishes and communicates QA & QC objectives.
  • During Performance Evaluation, Audit, and Warranty Period, the project goals are supported by which two mechanisms?
  • _____ _____ assures quality will be provided satisfactorily.
  • How many documents are included in the Executive Agreements?
  • In a performance-based environment, the Owner has direct control over how the work is performed, without assuming additional risk.
  • Which word completes the motto 'It's all about the _____: Communicate, Collaborate, Integrate'?
  • Which function focuses on verifying that the project outputs meet quality requirements during or after production?
  • Design Quality _____ is the soft stuff but hard to measure.
  • Which term best describes the concept of ongoing design progression over time?
  • Who is responsible for both QA and QC?
  • Formal periodic _____ _____ are an alternative dispute resolutions.
  • Which phase in oversight comes after Pre-Con and before Closeout?
  • Projects should be staffed with individuals that are _____ and ______ in the implementation of DB best practice and whose _______ are well-suited to the collaborative nature of the DB process.
  • Early involvement enables deeper participation in _____ practices.
  • In DB Leadership, which statements describe the relationship between Construction and Design processes?
  • The Integrated Project Leader is a traditional hard-bid project manager. True or False?
  • Which of the following is NOT a Trend Management tool?
  • _____ _____ is the part of quality management focused on actually fulfilling the project quality requirements defined in the RFP.
  • Which item is NOT one of the synergistic elements for the Owner's DB strategy?
  • Which of the following is a direct benefit of Incremental Design Packages in DB?
  • Understanding leads to _____ -- interdisciplinary fluency develops One Team.
  • _____ problem solving is what creates the opportunity to optimize the project.
  • Which role is known for ensuring design excellence within the DB team?
  • _____ _____ = (Performance + Quality) / Cost
  • The _____ Documents Describe the end result.
  • What are the two main roles in public owner contract oversight?
  • Which of the following is a trade contractor failure?
  • _____ design and _____ are significant project delivery objectives.
  • Which statement about DB staffing is true?
  • Which of the following is an explicit incentive example?
  • Which role is described as the integrator balancing the Owner's needs plus design and construction?
  • Who balances the Owner's needs plus design and construction responsibilities on a design-build project?
  • In Choosing by Advantages, decisions are based on evaluating what?
  • Where should value engineering be applied in DB process?
  • _____ Management typically focuses on building the project.
  • Design-Build Principle is _____ value
  • What is the purpose of the Issue Resolution Ladder in formal partnering?
  • The contract price for an estimator is established before the design is complete.